Family Ride
Description |
This new route includes crossing six bridges, including the upper decks of the Marquam and Fremont bridges and a thrilling ride through downtown Portland on I-405, all on car-free streets. ![]() |
Bridges crossed (in order) |
Morrison, Ross Island, Hawthorne, Marquam, Fremont, Steel |
Distance | 13 miles |
Start | SW Naito Pkwy. and Morrison |
Start time | 8:30 – 9:15 a.m. |
Finish | SW Naito Pkwy. and Ash |
Cost | Adult $35, Senior $30, Youth $25 |
Turn-by-Turn Instructions
Start: SW Naito Pkwy. at Morrison
Ramp to Morrison Bridge
Morrison Bridge
Exit the Morrison Bridge on the ramp to SE Water St.
Right on SE Water St.
Left on SE Caruthers St.
Right on SE Grand
Left on SE Division Pl.
Right on SE 6th Ave.
Left on SE Woodward
Right on SE 7th Ave.
Right on SE Powell Blvd.
Ross Island Bridge
Veer right onto SW Kelly
Right on ramp to SW Naito Pkwy.
Right on ramp to Hawthorne Bridge
Hawthorne Bridge
Exit left on SE Water St. ramp at the east end of the Hawthorne Bridge
Left on SE Water
Left on the ramp from I-5
Marquam Bridge
Exit the Marquam Bridge on to I-405 northbound
Fremont Bridge
Exit the Fremont Bridge on the Kerby St. ramp
Right on N Kerby
Right on N Russell
Left on N Albina
Left on N Interstate Ave.
Right on NE Oregon
Steel Bridge
Left onto NW Naito Parkway
Finish: SW Naito and Ash